Portfolio
WartsilaBLPC
Mechanical installation of 33MW fossil-fuel power plant.
The Estates
supply and installation of potable and wastewater pump systems, potable water storage tank, wastewater treatment plant, Reuse and irrigation pump systems,
CO Williams
Specification, supply and installation of a municipal sewage lift station and standby generator for the Barbados Water Authority at the Constitution River Project
BWA – Bridgetown Sewage Treatment Plant
Supply of Flygt Raw Water Pumps
Ocean 2
Supply and installation of a Potable Water booster pump set
Barbados Light and Power
Demolition of Boiler for decommissioned 25MW Steam Turbine.
The Estates Clubhouse
Supply and installation of 500 kVA standby generator.
Roberts Manufacturing
Replacement of feed mixer – a time sensitive installation involving removal of surrounding equipment, removal of the old mixer, assembly and installation of next mixer and reinstatement of plant.
BWA – South Coast Sewage Treatment Plant
Plant – Supply of Flygt Effluent Pumps
Hilton Barbados
Supply and installation of an industrial water softener for the domestic water supply at Hilton Barbados.